
Hotels and resorts
Guest rooms need heating and cooling on their own schedules, and hot water demand peaks morning and evening. Properties with a pool have a separate water temperature to hold.
Explore EXINDA heat pumps, chillers and ventilation systems for your building. Find relevant equipment and a starting point for project selection.

Guest rooms need heating and cooling on their own schedules, and hot water demand peaks morning and evening. Properties with a pool have a separate water temperature to hold.

Campus upgrades often happen in phases. Where existing boilers stay in service, new heat pumps need to work with the heating system already in place.

Limited installation space, individual comfort control and fresh-air delivery all shape equipment selection. Options range from in-unit HVAC and dedicated ERVs to a central hydronic loop.

Core zones with people and equipment need cooling while perimeter offices still need heat. When both happen at the same hour, a conventional changeover two-pipe system can't serve both.

Heating and chilled water can't go down for maintenance, so plant is sized with standby capacity and split across units. Selection is checked against the project's own design conditions.

Process water at a set temperature, and often waste heat from one process that another could use. Water-side equipment and heat recovery are the starting point.

Cooling capacity, chilled-water temperatures, redundancy and controls have to match the facility's design requirements. Chillers are selected against those conditions, project by project.
Distributors & Dealers
Expand your HVAC offering with EXINDA heat pumps and ventilation systems, backed by product training and technical support.
Engineering Firms & Contractors
Get the performance data, submittals and engineering support you need to select equipment and move your project forward.
HVAC Brands
Bring your product ideas to market with EXINDA’s engineering, testing and manufacturing expertise.