Air-to-Water Heat Pumps

Modular Heat Pump Pumping: Dedicated Pumps and Check Valves

Modular heat pump pumping guide illustrated with rows of rooftop heat pump units.

Modular heat pump pumping should coordinate water circulation with the modules that are operating. A dedicated pump and check valve for each module branch can be evaluated where the project calls for individual branch circulation and reverse-flow prevention.

EXINDA supports North American commercial HVAC project teams with product-side hydraulic, electrical and control review. This guide explains how to define a dedicated-pump arrangement, distinguish it from the standard equipment design, and verify it during commissioning.

What problem does dedicated module pumping address?

When several heat pump modules connect to common headers, the flow arrangement must accommodate modules starting, stopping and being taken out of service. The design needs adequate flow through active modules and appropriate management of inactive branches.

A dedicated branch pump provides circulation through its assigned path. A correctly selected and positioned check valve helps prevent reverse flow through that path. A check valve is not a substitute for a service isolation valve and does not automatically prevent all unwanted forward flow; review the complete pressure and valve arrangement.

Step 1: Identify the water circuit served by each pump

On the hydraulic schematic, mark each module, branch pump, check valve, isolation valve, common header and connection to the building circuit.

For a four-pipe system, distinguish the chilled-water and hot-water sides. “One pump per module” is incomplete until the water circuit is identified. Each side needs its own suitable circulation arrangement.

For the related operating-mode and capacity questions, see 4-pipe heat pump operating modes and turndown.

Step 2: Select the pump at its hydraulic duty point

Select by design flow and required head, rather than choosing a small pump simply because it serves one module. Include the pressure losses of the module water heat exchanger, branch pipework, valves, strainer and check valve, plus the applicable common circuit resistance.

Required input Design use
Design flow and required head Establish the pump duty point and operating range
Fluid and temperature Account for water or glycol properties and component suitability
Power supply and motor data Establish voltage, load and switching requirements
Fixed or variable speed Define how the pump responds to changing demand
Preferred brand and required ratings Match the project specification and installation environment
Pump body, impeller and seal material Confirm compatibility with water quality, glycol concentration, temperature and corrosion conditions
Pump efficiency, certification and redundancy requirements Match the project specification, local compliance requirements and operating strategy

For a closed circulation loop, pump head is based primarily on hydraulic resistance; building height is not simply added as static lift. System fill pressure and expansion provision remain separate design checks.

Step 3: Select and position the check valve

Review the valve's flow direction, permitted mounting orientation, pressure loss, opening characteristics and compatibility with the fluid. Position it according to the approved hydraulic design and provide access for maintenance.

Check operation at both design flow and the lowest expected flow. An unsuitable valve can add excessive resistance or behave poorly as flow changes. Include branch isolation separately so equipment can be serviced safely.

Step 4: Separate pump power from pump control

Define one of the following electrical arrangements before finalizing the equipment scope:

Arrangement What to define
Externally powered pump Independent pump supply and protection; compatible enable signal from the module or plant controller
Module-powered pump Electrical design and protection rated for the pump load, including any required switching components

Do not assume that a pump-control terminal can supply motor power. Match the signal type, output rating, pump running load and starting characteristics. Qualified installers should use the approved wiring diagram and isolate supplies before wiring.

For EXINDA modules whose standard design does not include this arrangement, dedicated pump integration requires a development review. EXINDA evaluates the proposed hydraulic duty, control sequence and electrical changes before the arrangement is included in the equipment scope.

Step 5: Define the start, stop and protection sequence

Document how circulation is established before compressor operation, how flow is verified, and what happens when a module stops or reports a fault. Include any post-run and protective circulation required by the selected equipment.

Coordinate branch pumps with the plant controller and any distribution pumps. For variable-speed operation, identify the controlled variable and maintain the module's permitted flow range. A reduced building load does not by itself justify reducing module flow below that range.

Factory Pre-Assembly and Site Connections for Modular Heat Pumps

EXINDA can supply prefabricated common-header sections for configurations of two, three or four modules, with valves pre-installed on the headers. Water piping and valve assemblies are also factory-installed on each individual module.

The interconnecting base sections are supplied separately. On site, the installation team assembles the modules and base sections, then completes the interconnecting water piping using flanged connections.

Factory inspection covers both the individual module piping and valve assemblies and the prefabricated common-header assemblies. The final supply scope and connection arrangement are confirmed in the project drawings.

Assembly EXINDA supply arrangement
Individual module piping and valves Factory-installed and inspected
Common headers for 2, 3 or 4 modules Prefabricated, with valves pre-installed and assemblies inspected
Interconnecting base sections Supplied separately for site assembly
Interconnecting water piping Connected on site using flanges

EXINDA Revit Kit for Modular Heat Pump Projects

EXINDA provides a Revit Kit to support equipment layout and piping coordination for modular heat pump projects. Consultants and contractors can contact EXINDA with their required module arrangement and Revit version to request the applicable files.

For two-, three- or four-unit piped assemblies, confirm the available model configuration and delivery timing with EXINDA during project coordination.

Step 6: Commission individual branches and combined operation

  1. Flush and vent the circuit, clean strainers and check valve positions.
  2. Command each pump separately and verify actual circulation through its assigned module.
  3. Measure branch flow and compare it with the design requirement.
  4. Start and stop adjacent modules; check active-branch flow and unwanted flow through inactive branches.
  5. Test demand removal, pump faults and the specified protective response using the approved commissioning procedure.
  6. Record settings, flows, wiring references and test results.

Frequently asked questions

Can every module use a dedicated pump and check valve?

The arrangement can be evaluated for the selected system. Define the circuit served, hydraulic duty, power source and control sequence before equipment selection.

Does a check valve replace an isolation valve?

No. A check valve controls reverse flow. Service isolation requires the appropriate isolation provisions.

Is dedicated pumping a standard EXINDA option?

Review the selected model's standard scope. Where dedicated pump integration differs from that scope, EXINDA evaluates it as a development requirement.

For the related thermal-mass calculation, review minimum active water volume for parallel commercial heat pump systems, including the conditions for a shared-volume calculation and the distinction between system volume and added buffer-tank capacity.

Review your modular heat pump pumping design with EXINDA

To request a review, send the following information to info@exindagroup.com:

  1. Design flow per module
  2. Required pump head
  3. Water or glycol concentration
  4. Minimum and maximum water temperature
  5. Available voltage, phase and frequency
  6. Fixed-speed or variable-speed requirement
  7. Preferred pump brand
  8. Required pump and seal materials
  9. Proposed pump start/stop sequence
  10. Hydraulic schematic

EXINDA can evaluate the module interface and required development, while the project designer and installer complete the site system design and commissioning.

View the EXINDA commercial heat pump and chiller range.

En lire plus

Heat pump secondary pump control guide with a plant-room photograph and circulation equipment detail.
Best 15 Heat Pump Manufacturers and Suppliers in 2026

Collaborez avec EXINDA

Fabricant mondial d’équipements CVC et fournisseur de solutions sur mesure

EXINDA est un fabricant mondial d’équipements CVC spécialisé dans les pompes à chaleur, les systèmes de ventilation et les solutions climatiques sur mesure pour les applications résidentielles et tertiaires.

Nous collaborons avec des distributeurs, des ingénieurs, des installateurs et des partenaires OEM dans le monde entier.

1. Distributeurs et revendeurs CVC
Nous accompagnons nos partenaires dans le monde entier avec des solutions fiables de pompes à chaleur et de ventilation.

2. Bureaux d’études et installateurs
Nous fournissons la documentation technique, une aide à la sélection des produits et un accompagnement des projets.

3. Partenaires OEM / ODM
Nous proposons des solutions CVC sur mesure, la fabrication en marque propre et un accompagnement du développement des produits.